Dave]
Vinyl Plank, Flooring, Underlayment, Baseboard, Stair case and nosing, T-moulding strip. Remove existing shoe moulding wherever required, don’t remove existing baseboards.
Total: 1000sqft house.
13 steps upper floor, 13 steps basement.
To apply, please visit the following URL:https://en-ca.whatjobs.com/pub_api__cpl__74604578__4809?utm_campaign=publisher&utm_medium=api&utm_source=4809→